My blog has moved!

You should be automatically redirected in 6 seconds. If not, visit
http://www.svkaleo.com
and update your bookmarks.

Showing posts with label Plumbing. Show all posts
Showing posts with label Plumbing. Show all posts

Sunday, November 22, 2009

From Single to Double in the Galley

Our original single-basin sink in the galley.
A little caulking romance.
Casey brought me to meet up with Matt while he was working on the new sink install. Looks like he found Kaleo to be pretty relaxing amidst the minor construction. The original single-basin sink in our galley was too shallow & small for any real dishwashing so we went on the search for the right double-basin. After months of research & an exhaustive search for an affordable option, we finally found one on eBay that fit the bill.

After a few weekends more than planned Matt got the old one removed, the counter cut out & the new one in place. In between all that, he managed to add fresh and salt water spigots (for greater water conservation), a new sprayer faucet, and plumbed all the necessary hoses. A now we have a fully functioning sink and an experience Matt hopes to only do once.

Saturday, October 10, 2009

If Only They Could All Look Like This

It's official. Today marks the LEAST amount of money we've spent at West Marine to date. That's right, the decimal is in the right place ... we spend a whopping $0.39 on 4 fasteners for the shower install.

Sailors Like To Be Clean Too

We spent the weekend getting a few new parts installed for liveaboard necessities. For some reason the former owner removed the shower system, but no worries Matt was able to install a more space and water efficient design that works perfectly for us.

Saturday, September 26, 2009

Electric head install complete

This weekend's refitting included Matt running wire from the breaker panel to the flush pump to power our new electric head.

Sunday, September 6, 2009

Productive & Fun Labor Day Wknd

Deciding where to mount the manual back-up pump.
Installing the waste hose.Helping our marina neighbor load up his dinghy to be repaired.
Family stopped by for a fun visit and brought BBQ lunch for the crew.

Saturday, September 5, 2009

Labor of Love

We spent this Labor Day weekend with one of our 1st major refit projects aboard Kaleo. September is dedicated to all things plumbing so we started with upgrading our manual-only toilet to an electric / manual back-up, Lavac. The 1st step was to have the holding tanks pumped out and rinsed followed by removing the old toilet. The greatest challenge was engineering a hose run that involved an electric pump, a manual back-up pump and a downhill run to the tank - all within the confines of the space below the v-berth.

We're happy to report that with the help of Christie's dad, Craig, the install was a success within "plan a" and without any sacrifices. We now have the convenience of an electric head with a manual back-up in case of power failure.